Browse Solutions
About
Press
Design Studio
Think Tank
Careers
Contact
Group 3
Search
Get In Touch
Browse solutions
Service Lines
Ports
Planning, design, technology—looking forward, cargo moved.
Ports
Planning, design, technology—looking forward, cargo moved.
Transportation
Vision meets design—the greater goods movement, connected.
Transportation
Vision meets design—the greater goods movement, connected.
Water
Coastal, estuarine, riverine—precious resources, managed.
Water
Coastal, estuarine, riverine—precious resources, managed.
Commercial
Analysis, planning, due diligence—speed of business, met.
Commercial
Analysis, planning, due diligence—speed of business, met.
Environment
Rising to the challenge—resilience, delivered.
Environment
Rising to the challenge—resilience, delivered.
Architecture & Landscape
Design sensitive to context and time – places, made.
Architecture & Landscape
Design sensitive to context and time – places, made.
Featured Projects
I-405 Improvement Project
Orange County, CA
Explore Project
San Elijo Lagoon Restoration
Encinitas, CA
Explore Project
Icy Strait Point Hoonah Berthing Facility
Hoonah, AK
Explore Project
By clicking “Accept”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our
Privacy Policy
for more information.
Deny
Accept
Privacy Preferences
Essential cookies
Required
Marketing cookies
Essential
Personalization cookies
Essential
Analytics cookies
Essential
Reject all cookies
Allow all cookies
Save preferences
2022 Makah Tribe Grant Application Documentation
Makah Tribe 2022 Grant Application Documents
PIDP 2022
PIDP 2022 Application Narrative
Appendix 1: PIDP FY22-BCA Report
Appendix 2: Environmental Justice Assessment
RAISE 2022
Raise 2022 Application Narrative
Appendix 1: FY22-BCA Report
Appendix 2: Environmental Justice Assessment
A. Supporting Documentation
Basis of Design
Biological Evaluation
Dredged Material Characterization Report
Suitability Determination
Makah - Certification of Consistency with Washington Coastal Zone Management Program
Water Quality Monitoring Plan
Project Mitigation Plan
Makah - 401 Water Quality Certification
Ecology - 401 Water Quality Certification
State Historical Preservation Act (Section 106) Concurrence
JARPA –
Construction JARPA
,
Construction JARPA Figures
,
Neah Bay Mitigation JARPA
,
Mitigation JARPA Attachment
SEPA Checklist
SEPA DNS
Final FR-EA Neah Bay Section 107
Section 404 and Section 10 Public Notice
USACE Section 10/404 Permit
USACE Finding of No Significant Impact
90% Engineering Drawings
Part 1
,
Part 2
,
Part 3
Engineering Construction Cost Estimate
Engineering Specifications
Environmental Justice Assessment
B. 2020 Letters of Support
Port of Seattle Executive Director Stephen Metruck
PMSA Captain Mike Moore
Foss Chief Operating Officer William Roberts
Trans Mountain Corporation President and Chief Operating Officer Ian Anderson
U.S. Senator Patty Murray
C. 2021 Letters of Support
Port of Seattle Interim Director Alex Adams
Congressman Derek Kilmer
Olympic Coast National Marine Sanctuary Superintendent Carol Bernthal
Marine Exchange of Puget Sound Executive Director John Veentjer
U.S. Senator Maria Cantwell
D. Benefit-Cost Analysis
Benefit-Cost Analysis
E. Regional Policy and Background
About the Makah
Vessel Entries and Transits (VEAT) for Washington Waters
Inslee-Trudeau Shipping Safety Talking Points
Memorandum of Agreement Between the United States Coast Guard and the Makah Indian Tribe
Department of Ecology, Emergency Response Towing Vessel
U.S. Coast Guard Designation of Neah Bay as Higher Volume Port Area
State Bill 5344 2009-10: Providing an Emergency Response System for the Strait of Juan de Fuca
33 CFR Part 155 Oil or Hazardous Material Pollution Prevention Regulations for Vessels
Final Restoration Plan and Environmental Assessment for the Tenyo Maru Oil Spill